We had our pre-drywall meeting today with our project manager. When he said, " pre- drywall" , he wasn't kidding. Drywall and insulation were literally being brought in as we were talking to him. Good thing we didn't have any major concerns because I am not sure when they would have addressed them! We met with our PM from 8:00-8:45am and insulation was done by 2:00pm ( except for what has to be blown in).
Things look great! We can tell where our outlets and switches are, where our lighting is, etc. Our hardware is mismatched right now because they are waiting on the rest of the oil rubbed bronze to be delivered but wanted to be able to have the doors completely shut.
The crew worked way into the evening today getting our drywall loaded into the correct level of the house since it's supposed to be terrible weather tomorrow.